petro completions

Modular Features
 

01
icon icon

Completion Schematic Solutions

Ensures comprehensive reservoir and well planning data capture, warehousing and management of the minimum required completion design parameters and allow systematic generation of high quality well completion architecture schematics for review and design integrity quality assurance.

Explore
02
icon icon

Clear Brine Fluid Advisor

Provides a shortlist of commercially available clear brine fluid systems for use as the primary completion fluid based on a set of conventional technical design criteria including density requirement, physical stability, compatibility with downhole materials and reservoir fluids.

Explore
03
icon icon

Tubing Stress Analysis

This system offers high-performance tubing design and analysis which allows the determination of the stresses, movements, and design factors that occur due to the applied load conditions on tubular strings to ensure the completion string will operate within established integrity limits to prevent downhole mechanical failures; applications include thermal modelling of produced/injected fluids, Life-of-Well load modelling and Torque & Drag analysis.

Explore
04
icon icon

Material Selection

Perform quantitative estimation of corrosion and erosional rates of carbon steel tubulars and the selection of corrosion resistant alloy and non-metallic material utilized in manufacture of downhole completion equipment with reference to defined wellbore and environmental parameters based on extensive industry field experience and the latest NACE MR0175/ISO 15156 prescribed limits.

Explore
05
icon icon

Reporting & Data tracking

Generate diverse scope of validated reports in various formats including standardized Well handover documents, End-of-Well reports, Statement of Requirements and highly visual completion schematics.

Explore
Make Enquiry

For better web experience, please use the website in portrait mode.

Mail Us Make Enquiry